By definition,
it is understood that First Article
Testing (FAT) and
Production Lot Testing (PLT)
somewhat differ. However,
the testing requirements,
subsequent results
and overall purpose for each
essentially have the same
intent. For both testing
conditions, approval ensures
the supplier can
furnish a product that
conforms to all contract
requirements for acceptance.
First article and production
lot testing
include the necessary
inspections, tests and
documentation to ensure
all product characteristics
conform to drawings
and/or specifications.
Process
Managers' Internal Control Program. This instruction contains
managers' internal control
provisions that are subject to
evaluation and testing as
required by DCMA-FBP: Managers' Internal Control
Program Instruction.
1. Perform Contract Technical Review and
Identify
FAT/PLT Contractual
Requirement - Normally, there
are two methods by which FAT requirements
appear in contracts.
Specifically, for FAT, there
is: 1) Contractor
Testing, FAR 52.209-3, which requires
the contractor to perform the
actual testing and submit a
test report to the PCO through
DCMA QA
personnel, or 2) Government
Testing, FAR 52.209-4, which provides
for the Government to
perform the actual testing
to verify the product conforms
to specification.
PLT may also have
either a Contractor PLT
or Government PLT requirement
stated in the contract.
1.1. Within
the contract, FAT/PLT may
be invoked by several
different methods
including but not limited to:
Contract Line Item Number
(CLIN), DD Form 1423 (Contract
Data Requirements
List (CDRL), Supplemental
Quality Assurance
Provision (SQAP),
Statement of Work (SOW), or
drawing.
Further guidance concerning
DCMA QA
personnel
responsibilities may be provided
through various
customer communications
including, but not limited to, a Quality Assurance Letter
of Instruction (QALI).
2. Determine
Need for Technical
Assistance - If QA personnel determine the need for additional technical
assistance or resources to perform the necessary FAT/PLT functions,
QA personnel shall make a request in writing to the supervisor for
assistance. When the FAT/PLT requirement includes testing
of software embedded in the end item or system, or stand-alone
software products, QA personnel should ensure a DCMA Certified
Software Professional is contacted for technical assistance. The supervisor will review the QA personnel request and provide
assistance as required. QA personnel shall keep
a record of the request for technical assistance and resource
support provided for the FAT/PLT requirements and, if applicable,
include a copy with the completed QA PAOC documentation file.
3. Conduct QA Post
Award Orientation
Conference (QA PAOC) - QA personnel shall conduct a PAOC in
accordance with the QA PAOC Instruction for the following
conditions that apply whether it
is either a Contractor or Government
FAT/PLT requirement:
A supplier is performing a
FAT/PLT for the first time
When extended time has passed
since the last FAT/PLT was performed by the
supplier
When FAT/PLT requirements change per the contract
When FAT/PLT related supplier technical, quality, or
documentation deficiencies, are being noted by QA personnel or reported
from either the lab conducting the testing or the procuring
activity
When the supplier has significant personnel changes
that may affect manufacturing and/or testing
processes
3.1.All personnel
required to provide
technical assistance to
DCMA QA
personnel should
either attend the
PAOC meeting
or, as required, teleconference into the meeting . As a minimum,
DCMA QA
personnel shall review and
discuss the specific first
article/production lot contractual requirements, required plans
or reports, QA
personnel inspection
hold points, and any inspections
or tests to be performed by the
supplier and/or DCMA at
subcontractor’s
locations.
3.2. A QA PAOC may not be
required when repetitive
contracts or orders with
FAT/PLT requirements are
issued to the same supplier or
the supplier is already
performing satisfactorily
on identical
items.
4. Develop
FAT/PLT Surveillance
Plan - QA personnel
shall develop and document a
plan for performing
surveillance of the
contractually required FAT/PLT
in accordance with the GCQA Surveillance
Planning Instruction.
The steps/bullets in
this paragraph may be used to
assist with developing the Risk Profile and
Plan.
4.1. Whether Contractor
or Government Testing – As
required by the contract,
the
plan shall:
Ensure the contract specified
FAT/PLT exhibit amounts are available for testing (as
applicable).
Ensure the contract specified
PLT samples are randomly selected for test/inspection (as
applicable).
Verify the supplier’s inspection of critical or major
product characteristics or processes identified in the FAT/PLT
report by independently inspecting or witnessing the supplier’s
inspection or testing of these characteristics or processes.
This includes characteristics or processes performed at
subcontractor facilities (not applicable to FAR 52.209-4).
If FAT/PLT sampling is authorized in the contract, perform
sample product examination of all other (non-critical or non-major)
product characteristics or processes to the degree necessary to
establish confidence of product conformance to technical
specifications (not applicable to FAR 52.209-4).
Verify the supplier's inspection/test records and test
report clearly demonstrate the products conformance to technical
specifications.
Ensure (as applicable) required records or reports are
sent to the approval authority.
Ensure all material/process certifications, inspection
method sheets, test reports, DD 250s, DD 1222 and any other
pertinent documentation are included with the exhibit (s)
designated for testing.
Perform any other activities requested by a QALI.
Ensure, if applicable, the prime QA personnel notifies the Place of
Performance (PoP) QA personnel that a FAT/PLT requirement is part of the
contract.
4.2. Specific to
Contractor Testing – As
required by the contract,
the
plan shall:
Verify the manufacturing processes, materials, and
facilities used to produce the FAT product are the same as
those used to produce production runs (FAR
52.209-3; Alternate 1, para i); NOTE:DLA Contractor FAT contracts may also specify DLA
Clause 52.209-9017 requirements; (if applicable) DLA Contractor
PLT contracts may also specify DLA Clause 52.246-9086
requirements.
4.3. Specific to
Government Testing – As
required by the contract,
the
plan shall:
Verify the manufacturing processes, materials, and
facilities used to produce the FAT product are the same as
those used to produce production runs (FAR
52.209-4; Alternate 1, para j); NOTE: DLA Government FAT
contracts may also specify DLA Clause 52.209-9018 requirements;
(if applicable) DLA Government PLT contracts may also specify DLA
Clause 52.246 -9085 requirements.
Verify the packaging is clearly marked (as applicable)
as either a: "FAT/PLT SAMPLE, DO NOT POST TO STOCK; DO NOT PUT
INTO SUPPLY."
4.4.
Determine Need for QA
Personnel
Inspection Hold Points - During
the GCQA surveillance planning
efforts, QA
personnel shall determine
if there is a need for inspection
hold points at the various
manufacturing process sequence
locations in accordance with
the Product Examination - QA
Instruction. Hold points
ensure the Government
inspections are not
inadvertently overlooked or
bypassed by the supplier.
4.5
Notify Supplier of GCQA Hold
Points - Where QA
personnel
determine Government inspection
hold points are necessary, the
supplier shall be notified in
writing detailing the
requirement in a manner where
supplier receipt and
acknowledgement is verifiable.
4.6. Determine Need
for GCQA at Subcontract
Level - Where surveillance, as developed in
accordance with paragraph 4.1.
for critical or major product
characteristics/processes can
only be performed at a
subcontractor’s facility, a
request for subcontract GCQA
shall be sent to the appropriate
DCMA office in accordance with
the Delegate Surveillance QA
Instruction. Such requests
shall be supported and
the results documented and
returned to the prime QA
personnel in a
timely manner.
5. QA
Personnel Executes
Surveillance - QA
personnel executes
surveillance in accordance with
the
FAT/PLT Surveillance Plan:
Actual product inspected or witnessed by QA personnel shall
be clearly identified to the approval authority. Reference the Product
Examination - QA Instructionfor product
inspection or witnessing specifics.
Contractual nonconformities identified by QA personnel
shall result in the appropriate level CAR. ReferenceCAR
Instruction.
6. Notify PCO of
any Nonconformity or
Waiver Request and Request
Instructions - QA personnel shall
notify
the PCO: 1) of any
identified nonconformity
and recommend disapproval;
2)
of any waiver request by the
supplier
(with appropriate QA
personnel
recommendation
for the waiver) and
request instructions
from the PCO as to how to
proceed with the FAT/PLT
requirement. QA
personnel
shall notify his/her
supervisor whenever a PCO
or ACO
(with delegated
authority) approves a first
article/production lot unit
containing nonconformities.
QA
personnel shall
ensure waiver requests
are processed and
approved by the PCO prior to
shipment of production
units.
7. QA Personnel Prepare FAT/PLT Results - QA personnel will use a DD
Form 1222 or cover letter to forward the supplier's FAT/PLT report and/or to
report the results of the inspection of the first article/production
lot units. The DD
Form 1222, or cover letter, will be separate from and in
addition to any supplier reports. QA personnel shall include the
following minimum information:
Names, activities, and telephone numbers of individuals
providing technical assistance to QA personnel and other Government
personnel witnessing or participating in the FAT/PLT.
A statement identifying the characteristics actually inspected
or witnessed by the Government. Alternatively, QA personnel may attach
copies of the inspection results if these forms clearly identify
the characteristics actually inspected or witnessed by the
Government.
A detailed description of any nonconformity in the FAT/PLT
units or test results or departures from the contractually
specified FAT/PLT procedures (if applicable).
A statement identifying by name, title, activity, and
telephone number the ACO or PCO authorizing the shipment of
nonconforming FAT/PLT units or test reports (if applicable).
A recommendation for approval or disapproval when the contract
requires contractor conducted FAT/PLT. Disapproval will always be
recommended whenever any nonconformity in the FAT/PLT units or
deviation from the FAT/PLT procedure is observed.
8. Notify ACO of
FAT/PLT Unit Shipment - Immediately
before shipment of a FAT/PLT
unit or test report, QA
personnel
shall request the ACO provide
the receiving activity with
the notice and advice required
in accordance with FAR 9.307. QA
personnel
shall not authorize the
supplier to ship FAT/PLT
exhibits or test reports
containing known or suspected
nonconformities, unless
specifically directed in
writing to do so by the ACO or
the PCO. QA
personnel shall
report immediately to
the ACO and PCO indications that
the supplier has or intends to
ship non-conforming
FAT/PLT units.
9. FAT/PLT Approval - When
the PCO retains approval or
disapproval authority, the
notification to the supplier as
to the approval, conditional
approval, or disapproval of
the first article/production
lot unit is the
responsibility of the PCO. Where approvals, conditional
approvals, or disapprovals are
received from other than the
PCO, i.e. the Technical
Activity, QA
personnel will forward
a copy to the appropriate ACO
for their coordination
with the PCO. Formal notice to
the supplier will be signed
by the PCO or ACO.
9.1. Where the PCO
elects to delegate first
article/production lot
approval authority to the
ACO, formal notice to the
supplier of first article/production
lot approval/disapproval
shall be signed by the
ACO.
9.2. Approved FAT
units sometimes serve as a
manufacturing standard for
production units, but only
when specifically
stated in the contract. When
this occurs, the FAT unit may be
useful in evaluating the
adequacy of production units
with respect to technical
requirements. The
approval of a nonconforming
FAT unit shall not be construed
as authorization to accept
production items containing any
nonconformity with the
contract
requirements.
9.3. Most
contracts require
first article/production lot
units to be manufactured
using the same facilities,
manufacturing processes,
methods, and materials as the
production units. When this or similar
requirements are included in the
contract, and QA
personnel observe
any changes that may reasonably
be expected to affect product
quality, QA
personnel will immediately
advise the PCO and ACO of the
circumstances. QA personnel
shall issue a CAR, if
warranted, and withhold formal
acceptance pending further
direction from the
PCO.
9.4. Before
accepting and/or authorizing
shipment of any production
quantities, QA
personnel shall
verify and document that
contractor corrective
actions resulting from
the first article/production
lot test were
implemented and any deficiencies
noted in letters of conditional
approval were
corrected.
Metric: FAT/PLT properly planned, executed, and documented
as evidenced through First Level Supervisor (FLS) Review.
FAT/PLT surveillance is accomplished in accordance with technical and schedule
requirements; results are reported via 1222 or customer directed
equivalent; recommendations address all variances and
deviations. Calculation: The number of FAT/PLTs found without any
planning, execution, or documentation errors divided by the
total number of FATs conducted during the report period.
Performance Standard: FAT/PLT shall be properly planned,
executed and documented 100% of the time required by contract.